Bangalore Metro Pink Line 2026: Route, Stations, Timings and Ticket Price
Bangalore Metro Pink Line is one of the major expansions of Namma Metro under Phase 2. The first elevated section of the Pink Line was inaugurated on 13 November 2026, and passenger services started on 14 November 2026. The newly opened section connects Kalena Agrahara with SG Palya through six stations over approximately 7.5 km.
The complete Pink Line is planned to connect Kalena Agrahara in South Bengaluru with Nagawara in North Bengaluru. The full corridor is approximately 21.26 km long and consists of a 7.5 km elevated section and a 13.76 km underground section. Once fully operational, the line will have 18 stations.
For passengers, the new corridor provides metro connectivity along Bannerghatta Road and introduces an interchange with the Yellow Line at Jayadeva Hospital. The reported ticket fare for the newly opened elevated section ranges from Rs 10 to Rs 30 depending on the destination.
Bangalore Metro Pink Line 2026: Quick Overview
Metro Line: Pink Line
Metro Authority: Bangalore Metro Rail Corporation Limited (BMRCL)
Starting Station: Kalena Agrahara
Current Terminal: SG Palya (formerly Tavarekere)
Future Terminal: Nagawara
Total Route Length: 21.26 km
Currently Operational Length: 7.5 km
Total Planned Stations: 18
Currently Operational Stations: 6
Inauguration Date: 13 November 2026
Passenger Service Date: 14 November 2026
Reported Ticket Fare: Rs 10 to Rs 30
Peak Hour Frequency: 8 minutes initially
Underground Section Target: Mid-2027
Official Website: BMRCL
Last Updated: 14 November 2026
1. Bangalore Metro Pink Line Route 2026
The Pink Line is designed to connect the southern and northern parts of Bengaluru. The complete route starts at Kalena Agrahara and ends at Nagawara.
The corridor is divided into two major sections: an elevated section and an underground section. The elevated section has started passenger operations, while the underground section is still under construction and systems testing.
| Route Details | Information |
|---|---|
| Starting Point | Kalena Agrahara |
| Final Destination | Nagawara |
| Total Length | 21.26 km |
| Elevated Section | 7.5 km |
| Underground Section | 13.76 km |
| Total Stations | 18 |
| Operational Section | Kalena Agrahara to SG Palya |
Currently Operational Route
The first operational section covers approximately 7.5 km between Kalena Agrahara and SG Palya. It has six stations and provides metro access to important locations along Bannerghatta Road.
The route is particularly useful for passengers travelling towards Hulimavu, Bilekahalli, JP Nagar 4th Phase and Jayadeva Hospital.
Future Pink Line Route
After the underground section becomes operational, the Pink Line will continue from the current SG Palya terminal towards Nagawara. This section will provide connectivity to Dairy Circle, MG Road, Shivaji Nagar, Cantonment and other important areas.
2. Bangalore Metro Pink Line Station List 2026
The complete Pink Line is planned to have 18 stations. Six stations belong to the elevated section and 12 stations belong to the underground section.
Pink Line Elevated Stations - Currently Operational
| No. | Station Name | Status |
|---|---|---|
| 1 | Kalena Agrahara | Operational |
| 2 | Hulimavu | Operational |
| 3 | Bilekahalli-IIMB (IIMB) | Operational |
| 4 | NS Palya-JP Nagar 4th Phase | Operational |
| 5 | Jayadeva Hospital | Operational |
| 6 | SG Palya (formerly Tavarekere) | Operational |
Pink Line Underground Stations - Upcoming
The remaining underground section will connect the current SG Palya terminal with Nagawara. The following 12 stations are planned along this section.
| No. | Underground Station | Status |
|---|---|---|
| 7 | Dairy Circle | Upcoming |
| 8 | Lakkasandra | Upcoming |
| 9 | Langford Town | Upcoming |
| 10 | National Military School | Upcoming |
| 11 | MG Road | Upcoming |
| 12 | Shivaji Nagar | Upcoming |
| 13 | Cantonment | Upcoming |
| 14 | Pottery Town | Upcoming |
| 15 | Tannery Road | Upcoming |
| 16 | Venkateshpura | Upcoming |
| 17 | Kadugundanahalli | Upcoming |
| 18 | Nagawara | Upcoming |
Important: The underground station list represents the planned full Pink Line alignment. These stations should not be treated as operational passenger stations as of 14 November 2026.
3. Bangalore Metro Pink Line Ticket Price 2026
The reported fare for the newly opened Pink Line elevated section ranges from Rs 10 to Rs 30, depending on the distance travelled. The complete journey between SG Palya and Kalena Agrahara costs Rs 30 according to the reported fare announcement.
Passengers travelling shorter distances will pay lower fares. The following table shows the reported fare information for selected journeys on the new section.
| From SG Palya | Destination | Reported Fare |
|---|---|---|
| SG Palya | NS Palya | Rs 10 |
| SG Palya | JP Nagar 4th Phase | Rs 10 |
| SG Palya | Hulimavu | Rs 20 |
| SG Palya | Bilekahalli-IIMB | Rs 20 |
| SG Palya | Kalena Agrahara | Rs 30 |
The fares above are based on published reporting about the announced fare structure. The complete official station-to-station tariff should be checked through the BMRCL ticketing system before travel. A separate fare for every possible station pair is not reproduced here because the full tariff matrix has not been independently verified.
How Much Does a Full Pink Line Journey Cost?
The reported fare for the entire operational elevated section between SG Palya and Kalena Agrahara is Rs 30. The underground section towards Nagawara is not yet open, so a complete end-to-end Pink Line fare is not available for passenger travel as of 14 November 2026.
4. Bangalore Metro Pink Line First Train and Last Train Timings
BMRCL has announced a separate operating timetable for the newly opened Pink Line section. The first train timing differs on Monday, Tuesday to Saturday and Sunday.
| Day | First Train from Kalena Agrahara | First Train from SG Palya |
|---|---|---|
| Monday | 4:55 AM | 5:00 AM |
| Tuesday to Saturday | 6:00 AM | 6:00 AM |
| Sunday | 7:00 AM | 7:00 AM |
Last Train Timing
Published reports on the initial operating schedule indicate the last departure from Kalena Agrahara at 10:50 PM. The reported last departure from SG Palya varies between 10:45 PM and 10:54 PM across reports. Passengers should verify the live or latest official BMRCL timetable before planning a late-night journey.
Pink Line Train Frequency
| Operating Period | Train Frequency |
|---|---|
| Monday to Friday Peak Hours | Every 8 minutes |
| Monday to Friday Non-Peak Hours | Every 10 minutes |
| Saturday | Every 10 minutes |
| Sunday | Every 10 minutes |
Initially, five trains have been allocated to the elevated section. Four trains are planned for regular passenger service and one train is kept on standby. Service frequency may change according to passenger demand and operational requirements.
5. Jayadeva Hospital Metro Interchange
Jayadeva Hospital is an important interchange station on the Pink Line. Passengers can transfer between the Pink Line and Yellow Line at this station.
The Yellow Line connects RV Road with Bommasandra and provides access to important locations such as Electronic City. The interchange makes the new Pink Line section more useful for passengers travelling between South Bengaluru and the IT corridor.
| Metro Line | Route | Interchange Station |
|---|---|---|
| Pink Line | Kalena Agrahara to SG Palya | Jayadeva Hospital |
| Yellow Line | RV Road to Bommasandra | Jayadeva Hospital |
6. How to Book Bangalore Metro Pink Line Tickets?
Passengers can use the available Namma Metro ticketing channels to purchase tickets. BMRCL supports QR-based digital tickets, tokens and contactless smart cards.
Option 1: QR Code Ticket
- Open the Namma Metro official app or an available authorised ticketing platform.
- Select the starting station and destination station.
- Check the automatically calculated fare.
- Complete the digital payment.
- Receive the QR ticket on your phone.
- Scan the QR ticket at the designated entry and exit gates.
Option 2: WhatsApp Metro Ticket
BMRCL also provides a WhatsApp-based ticketing facility through its official chatbot number 81055-56677. Passengers can select their entry and exit stations, check the fare and receive a digital QR ticket.
Option 3: Smart Card
Passengers who travel frequently can use a contactless Namma Metro smart card. The BMRCL ticket information page lists the card price as Rs 50, excluding the travel balance.
The official ticket page also mentions a 5% discount on token fares for eligible smart-card travel. Passengers should check the current card conditions and applicable fare rules.
7. When Will the Full Bangalore Metro Pink Line Open?
The complete Pink Line is not yet operational. The 7.5 km elevated section has started passenger services, while the remaining 13.76 km underground section towards Nagawara is under development.
According to the Japan International Cooperation Agency update dated 13 November 2026, the remaining underground section is expected to become operational by mid-2027.
| Pink Line Section | Length | Current Status |
|---|---|---|
| Kalena Agrahara to SG Palya | 7.5 km | Operational |
| SG Palya to Nagawara | 13.76 km | Under construction and testing |
| Complete Pink Line | 21.26 km | Partially operational |
Once the underground section opens, the Pink Line will provide connectivity towards MG Road, Shivaji Nagar, Cantonment and Nagawara. It will also provide an interchange with the Purple Line at MG Road.
8. Benefits of Bangalore Metro Pink Line
The Pink Line is expected to improve public transportation across South and North Bengaluru. Its main benefits include:
- Improved metro connectivity along Bannerghatta Road.
- Better access to Hulimavu and Bilekahalli.
- Metro connectivity near IIM Bangalore.
- Interchange facility with Yellow Line at Jayadeva Hospital.
- Reduced dependence on road transport for suitable journeys.
- Future connectivity towards MG Road and Nagawara.
- Better access to central and northern Bengaluru after the underground section opens.
9. Official Sources and References
Passengers should use official sources to verify route maps, station names, service timings, fares and upcoming commissioning announcements.
- Bangalore Metro Rail Corporation Limited (BMRCL) - Official metro authority website.
- BMRCL Ticket Information - QR tickets, smart cards and ticketing information.
- BMRCL Metro Timings - Passenger timetable information.
- Japan International Cooperation Agency (JICA) - Official announcement dated 13 November 2026 confirming the Pink Line elevated section, route length, six stations and future project timeline.
- Press Information Bureau - Government announcements regarding the Pink Line inauguration.
Frequently Asked Questions (FAQs)
1. Is Bangalore Metro Pink Line operational in 2026?
Yes. The first 7.5 km elevated section between Kalena Agrahara and SG Palya started passenger services on 14 November 2026.
2. What is the Bangalore Metro Pink Line route?
The complete route connects Kalena Agrahara in South Bengaluru with Nagawara in North Bengaluru.
3. How many stations are there on the Pink Line?
The complete Pink Line is planned to have 18 stations, including six elevated and 12 underground stations.
4. How many Pink Line stations are currently operational?
Six stations are currently operational on the elevated section between Kalena Agrahara and SG Palya.
5. What is the Bangalore Metro Pink Line ticket price?
Published fare information reports prices between Rs 10 and Rs 30 for the newly opened elevated section. The full section fare is reported as Rs 30. Check the BMRCL ticketing system for the applicable fare before travel.
6. What is the Pink Line first train timing?
On Monday, the first train departs at 4:55 AM from Kalena Agrahara and 5:00 AM from SG Palya. From Tuesday to Saturday it starts at 6:00 AM from both terminals. On Sunday the first service starts at 7:00 AM.
7. What is the Pink Line last train timing?
The reported last departure from Kalena Agrahara is 10:50 PM. Reports differ on the last departure from SG Palya, so passengers should check the latest BMRCL timetable.
8. How often do Pink Line trains run?
Initially, trains run every eight minutes during weekday peak hours and every ten minutes during non-peak periods and weekends.
9. Where can I interchange between Pink Line and Yellow Line?
Passengers can change between the two lines at Jayadeva Hospital station.
10. When will the full Pink Line open?
The remaining underground section is expected to become operational by mid-2027 according to the JICA update dated 13 November 2026.
11. Which stations are included in the Pink Line underground section?
The planned stations are Dairy Circle, Lakkasandra, Langford Town, National Military School, MG Road, Shivaji Nagar, Cantonment, Pottery Town, Tannery Road, Venkateshpura, Kadugundanahalli and Nagawara.
12. How can I book Bangalore Metro Pink Line tickets online?
Passengers can use the official Namma Metro app or the authorised WhatsApp ticketing service at 81055-56677 to obtain QR tickets.
13. Does the Pink Line connect to the Purple Line?
The future underground section will provide a Purple Line interchange at MG Road after it becomes operational.
14. What is the total length of the Pink Line?
The complete Pink Line is approximately 21.26 km long, including 7.5 km elevated and 13.76 km underground.
15. Which authority operates Bangalore Metro Pink Line?
Bangalore Metro Rail Corporation Limited (BMRCL) is responsible for implementing and operating Namma Metro.
Conclusion
Bangalore Metro Pink Line is an important addition to the Namma Metro network in 2026. The first 7.5 km elevated section between Kalena Agrahara and SG Palya is now operational, providing six stations and an interchange with the Yellow Line at Jayadeva Hospital.
The reported ticket fare for the new section ranges from Rs 10 to Rs 30, while the initial train frequency is eight minutes during weekday peak hours. The remaining 13.76 km underground section towards Nagawara is expected to become operational by mid-2027. Passengers should always verify the latest fares and train timings through the official BMRCL website before travelling.