Indore Metro Longest Route 2026: Complete Route, Distance and Station Details
Indore Metro is an important public transport project for Indore city in Madhya Pradesh. The Yellow Line is planned as a circular ring corridor connecting major residential, commercial, railway and airport areas. The officially approved project document describes a ring line of approximately 31.55 kilometres with 30 stations.
Which Is the Longest Metro Route in Indore?
The Yellow Line is the main circular metro corridor of Indore and is the longest planned metro route in the city project. According to the Union Cabinet approval, the approved ring corridor has a total length of 31.55 km and 30 stations. It is designed to connect important parts of Indore through a continuous urban transit network.
Indore Metro Yellow Line: Key Details
- Metro Line: Yellow Line
- Route Type: Circular Ring Corridor
- Officially Approved Length: 31.55 km
- Stations in Cabinet Approval: 30
- City: Indore, Madhya Pradesh
- Implementing Agency: Madhya Pradesh Metro Rail Corporation Limited
Indore Metro Yellow Line Route
The approved ring corridor connects major areas around Indore. The route description in the Union Cabinet release identifies Bengali Square, Vijay Nagar, Bhawarsala, Airport and Palasia as important points of the ring corridor. The notified Yellow Line alignment also includes Gandhi Nagar, Super Corridor, MR 10 Road, ISBT, Vijay Nagar, Palasia, Railway Station, Rajwada and Airport areas.
Important Areas on the Yellow Line
| S. No. | Area / Station Corridor | Route Information |
|---|---|---|
| 1 | Gandhi Nagar | Northern side of the notified alignment |
| 2 | Super Corridor | Connectivity to developing commercial areas |
| 3 | Bhawarsala | Important route connection |
| 4 | MR 10 Road and ISBT | Road and bus connectivity zone |
| 5 | Vijay Nagar | Major commercial and residential area |
| 6 | Khajrana and Bengali Square | Southern and eastern city connectivity |
| 7 | Palasia and Railway Station | Central city and railway connectivity |
| 8 | Rajwada and Bada Ganpati | Old city connectivity |
| 9 | Airport | Airport connectivity in the planned alignment |
Note: This is an overview of important areas in the notified alignment, not a claim that every listed station is currently operational. Station names and alignment details should be checked against the latest MPMRCL information.
How Much of Indore Metro Is Currently Operational?
As per the Press Information Bureau release dated 5 September 2026, the inauguration of Priority Corridor-2 expanded the Indore Metro network to 16 operational stations covering approximately 17 km. This operational section is only part of the larger planned Yellow Line ring corridor.
| Particular | Details |
|---|---|
| Operational Stations | 16 |
| Operational Network Length | Approximately 17 km |
| Full Approved Ring Line Length | 31.55 km |
| Full Ring Line Stations in Cabinet Approval | 30 |
Why Is the Yellow Line Important for Indore?
- It is planned to connect important residential and commercial areas.
- It provides a framework for connectivity with railway and airport areas.
- It can help reduce dependence on private vehicles for selected journeys.
- It supports better public transport connectivity across the city.
- It is expected to support planned urban development around metro stations.
Official Sources and References
- Prime Minister of India: Cabinet approval for Indore Metro Ring Line
- Government of India Gazette: Indore Metro Yellow Line alignment
- Press Information Bureau: Indore Metro Priority Corridor-2 inauguration
- Madhya Pradesh Metro Rail Corporation Limited
Frequently Asked Questions
1. Which is the longest metro route in Indore?
The Yellow Line is the planned circular ring corridor and the longest main metro corridor in the Indore project.
2. What is the approved length of Indore Metro Yellow Line?
The Union Cabinet approval records the ring corridor length as 31.55 kilometres.
3. How many stations are included in the approved ring line?
The Union Cabinet approval mentions 30 stations on the ring line.
4. How many Indore Metro stations are operational?
The PIB release dated 5 September 2026 reported 16 operational stations covering approximately 17 kilometres.
5. Does the operational metro currently cover the entire ring route?
No. The operational section is only part of the larger planned ring corridor.
6. Which agency is implementing the Indore Metro project?
Madhya Pradesh Metro Rail Corporation Limited is the implementing agency for the project.
Conclusion
The Indore Metro Yellow Line is the city main planned circular corridor. The official Union Cabinet approval records a length of 31.55 km and 30 stations. However, the operational network reported by PIB in September 2026 covered approximately 17 km with 16 stations. Passengers should check the official MPMRCL website for current services, station status and route updates.