Indore Metro Stations List 2026: How Many Stations Are Operational? Check Full List
Indore Metro has expanded its passenger services in 2026. As of 14 November 2026, 16 stations are operational on the Yellow Line, covering approximately 17 km. The operational route runs from Devi Ahilya Bai Holkar Terminal in Gandhi Nagar to Radisson Square, also known as Malviya Nagar Chauraha.
The Yellow Line is part of the larger Indore Metro Phase 1 network. The complete planned corridor is approximately 33.53 km long and includes 29 stations. The remaining 13 stations are not yet operational.
Indore Metro Stations: Key Facts
Metro Line: Yellow Line
Operational Stations: 16
Total Planned Stations: 29
Stations Not Yet Operational: 13
Operational Route Length: Approximately 17 km
First Operational Station: Devi Ahilya Bai Holkar Terminal
Last Operational Station: Radisson Square
Metro Operator: Madhya Pradesh Metro Rail Corporation Limited
Information Updated: 14 November 2026
1. How Many Indore Metro Stations Are Operational?
According to the Press Information Bureau announcement dated 5 September 2026, Indore Metro Priority Corridor-2 was inaugurated, expanding the operational network to 16 stations across approximately 17 km.
The new corridor covers approximately 11 km and connects Super Corridor-3 to Malviya Nagar Chauraha through 11 stations. This expansion increased the passenger network beyond the initial operational section.
| Particular | Information |
|---|---|
| Total Planned Yellow Line Stations | 29 |
| Operational Stations | 16 |
| Stations Not Yet Operational | 13 |
| Operational Network Length | Approximately 17 km |
| First Station | Devi Ahilya Bai Holkar Terminal |
| Last Operational Station | Radisson Square |
2. Complete List of 16 Operational Indore Metro Stations
The following is the operational Yellow Line station sequence from Gandhi Nagar towards Radisson Square.
| No. | Station Name | Operational Status |
|---|---|---|
| 1 | Devi Ahilya Bai Holkar Terminal (Gandhi Nagar) | Operational |
| 2 | Maharani Lakshmi Bai | Operational |
| 3 | Rani Avanti Bai Lodhi | Operational |
| 4 | Rani Durgavati | Operational |
| 5 | Veerangana Jhalkari Bai | Operational |
| 6 | Super Corridor 2 | Operational |
| 7 | Super Corridor 1 | Operational |
| 8 | Bhawarshala Square | Operational |
| 9 | MR 10 Road | Operational |
| 10 | ISBT / MR 10 Flyover | Operational |
| 11 | Chandragupta Square | Operational |
| 12 | Hira Nagar | Operational |
| 13 | Bapat Square | Operational |
| 14 | Meghdoot Garden | Operational |
| 15 | Vijay Nagar Square | Operational |
| 16 | Radisson Square (Malviya Nagar Chauraha) | Operational |
3. First and Last Operational Indore Metro Stations
The operational Yellow Line begins at Devi Ahilya Bai Holkar Terminal in Gandhi Nagar and currently ends at Radisson Square, also known as Malviya Nagar Chauraha.
First Operational Station
Devi Ahilya Bai Holkar Terminal
Gandhi Nagar
Last Operational Station
Radisson Square
Malviya Nagar Chauraha
4. How Many Indore Metro Stations Are Yet to Open?
The complete Yellow Line plan includes 29 stations. Out of these, 16 are operational and the remaining 13 are not yet open for passenger services.
| No. | Station Name | Status |
|---|---|---|
| 17 | Mumtaj Bag Colony | Not operational |
| 18 | Khajrana Square | Not operational |
| 19 | Bengali Square | Not operational |
| 20 | Patrakar Colony | Not operational |
| 21 | Palasia Square | Not operational |
| 22 | High Court | Not operational |
| 23 | Indore Junction Railway Station | Not operational |
| 24 | Rajwada | Not operational |
| 25 | Chhota Ganpati | Not operational |
| 26 | Bada Ganpati | Not operational |
| 27 | Ramchandra Nagar Square | Not operational |
| 28 | BSF / Kalani Nagar | Not operational |
| 29 | Airport | Not operational |
The above list identifies stations that are not yet operational. It is not a station-wise construction completion schedule or an announced passenger opening programme.
5. When Did the Latest Metro Corridor Open?
The Press Information Bureau announced the inauguration of Priority Corridor-2 on 5 September 2026. The new section connects Super Corridor-3 to Malviya Nagar Chauraha through approximately 11 km and 11 stations.
The expansion increased the reported operational network to 16 stations and approximately 17 km. Passenger service information and operating notices should be checked through official MPMRCL channels.
6. What Is the Total Length of Indore Metro Yellow Line?
The complete Yellow Line is planned as a circular corridor of approximately 33.53 km with 29 stations. The operational portion reported in September 2026 covers approximately 17 km and 16 stations.
The remaining part of the route extends towards the central city, Railway Station and Airport. These stations are not yet included in the operational passenger network.
7. Which Areas Are Connected by the Operational Metro?
The currently operational stations provide metro connectivity to Gandhi Nagar, Super Corridor, Bhawarshala, MR 10, ISBT, Hira Nagar, Bapat Square and Vijay Nagar areas.
- Gandhi Nagar: Connectivity through Devi Ahilya Bai Holkar Terminal.
- Super Corridor: Super Corridor 2 and Super Corridor 1 stations.
- Bhawarshala: Bhawarshala Square station.
- MR 10: MR 10 Road and ISBT / MR 10 Flyover stations.
- Vijay Nagar: Chandragupta Square, Hira Nagar, Bapat Square, Meghdoot Garden and Vijay Nagar Square.
- Radisson Square: Current operational terminal of the expanded corridor.
8. Official Indore Metro Route and Station Information
Passengers should check the official metro operator and government announcements for confirmed operational status, service notices and route changes.
- MPMRCL Official Website - metro project and passenger information.
- Press Information Bureau - Priority Corridor-2 Inauguration - confirmation of 16 operational stations and approximately 17 km network.
- Government of India Gazette - notified Yellow Line alignment.
Frequently Asked Questions (FAQs)
1. How many Indore Metro stations are operational in 2026?
According to the PIB announcement dated 5 September 2026, 16 stations were operational across approximately 17 km.
2. What is the first station of Indore Metro?
Devi Ahilya Bai Holkar Terminal in Gandhi Nagar is the first station on the operational route.
3. What is the last operational Indore Metro station?
Radisson Square, also known as Malviya Nagar Chauraha, is the last operational station on the expanded route.
4. How many total stations are planned on the Yellow Line?
The complete Yellow Line plan includes 29 stations.
5. How many stations are not yet operational?
Thirteen stations in the remaining Yellow Line list are not yet operational.
6. Is Khajrana Metro Station operational?
Khajrana Square is included in the list of stations that are not yet operational.
7. Is the Indore Railway Station Metro operational?
Indore Junction Railway Station is included in the remaining station list and is not part of the 16 operational stations.
8. Is Indore Airport Metro Station open?
Airport is included in the planned Yellow Line station list but is not included in the operational 16-station section.
9. What is the operational length of Indore Metro?
The operational network was reported at approximately 17 km in the PIB announcement dated 5 September 2026.
10. Where can I check the latest Indore Metro station list?
Check the MPMRCL official website and government announcements for confirmed service information and station updates.
Conclusion
Indore Metro has 16 operational stations on the Yellow Line, covering approximately 17 km according to the PIB announcement of 5 September 2026. The operational route starts at Devi Ahilya Bai Holkar Terminal in Gandhi Nagar and ends at Radisson Square. The complete Yellow Line plan includes 29 stations, with 13 additional stations not yet operational. Passengers should use the official MPMRCL website and government announcements to verify service status and future station opening dates.