Indore Metro Railway Station Route 2026: How to Reach Indore Railway Station by Metro?
Indore Junction Railway Station is one of the most important transport hubs in the city. Many passengers want to know whether they can reach Indore Railway Station directly by metro and which Yellow Line station is closest to the railway station.
Indore Metro Yellow Line includes Indore Railway Station in its notified future route alignment. However, the railway station metro stop should not be confused with the currently operational metro stations. According to the government announcement dated 5 September 2026, the operational network had 16 stations covering approximately 17 kilometres. The Railway Station location is part of the wider planned underground corridor.
Indore Metro to Railway Station – Quick Details
- Destination: Indore Junction Railway Station
- Metro Line: Yellow Line
- Planned Metro Stop: Indore Railway Station
- Current Metro Status: Direct passenger service not confirmed as operational
- Operational Metro Network: Approximately 17 KM
- Operational Stations: 16, as announced in September 2026
- Future Route Sequence: Palasia Chauraha – Railway Station – Rajwada
- Project Authority: Madhya Pradesh Metro Rail Corporation Limited (MPMRCL)
1. Can You Reach Indore Railway Station by Metro in 2026?
As of the latest government operational update used in this article, a direct metro passenger service to Indore Junction Railway Station has not been confirmed. The metro network announced by the Press Information Bureau on 5 September 2026 had 16 operational stations and covered approximately 17 kilometres.
Indore Railway Station is included in the notified Yellow Line alignment, but it belongs to the future underground section. A construction contract announcement by Hindustan Construction Company in March 2025 also listed Indore Railway Station among the underground stations included in the project package.
Therefore, passengers should not plan a complete journey to the railway station assuming that the metro train currently stops there. Check the latest MPMRCL passenger announcements before travelling.
2. Which Metro Station Is Planned for Indore Railway Station?
The planned Yellow Line station is identified as Indore Railway Station in the project route information. It is part of the underground corridor that connects the central city area towards the airport side.
The Government of India Gazette notification dated 22 August 2024 includes Railway Station in the notified Yellow Line sequence, between Palasia Chauraha and Rajwada.
Planned Metro Route Near Railway Station
Palasia Chauraha
↓
Indore Railway Station
↓
Rajwada
This is the notified route sequence, not a confirmation that these stations are currently open for passengers.
3. How to Reach Indore Railway Station Using Metro and Road Transport?
Until direct metro service to the railway station is officially opened, passengers can use the operational metro network for part of their journey and complete the remaining distance by road transport. The exact choice of metro station depends on the passenger starting point and current service availability.
Option 1: Metro plus Auto or Cab
- Check the current operational Yellow Line stations on the MPMRCL website.
- Travel by metro to a station that is convenient for your onward road journey.
- Exit the metro station and arrange an auto, cab or other local transport.
- Enter Indore Junction Railway Station as your destination.
- Allow extra time for road traffic, luggage and railway security checks.
Option 2: Direct Auto or Cab
If you are carrying heavy luggage or have limited time before your train departure, a direct auto or cab from your current location may be more convenient. Check the estimated road travel time before leaving.
Option 3: City Bus or Other Public Transport
Passengers can also check available city bus services and other public transport connections to Indore Junction. Confirm the current route, operating time and stop location before starting the journey.
4. Indore Metro Yellow Line Route and Railway Station Connectivity
The Government of India Gazette notification lists the Yellow Line Ring Corridor route locations in the following sequence:
- Gandhi Nagar
- Super Corridor 6
- Super Corridor 5
- Super Corridor 4
- Super Corridor 3
- Super Corridor 2
- Super Corridor 1
- Bhawarsala Chauraha
- MR 10 Road
- ISBT
- Chandragupta Chauraha
- Hira Nagar
- Bapat Chauraha
- Meghdoot Garden
- Vijay Nagar Chauraha
- Malviya Nagar Chauraha
- Shaheed Bagicha
- Khajrana Chauraha
- Bengali Chauraha
- Patrakar Colony
- Palasia Chauraha
- Railway Station
- Rajwada
- Chhota Ganpati
- Bada Ganpati
- Ramchandra Nagar
- BSF Kalani Nagar
- Airport
This is the notified route alignment. The full list should not be treated as the list of stations currently operating for passengers.
5. Will Indore Metro Provide Direct Connectivity to the Railway Station?
Yes, the planned Yellow Line alignment includes a Railway Station stop. The Union Cabinet project description also identifies Railway Station as one of the important public transport nodes for multimodal integration.
The project is intended to connect metro services with railway and bus transport facilities, along with feeder services. Once the railway station metro stop is commissioned and passenger operations begin, travellers will be able to use the official interchange and access arrangements announced by MPMRCL.
Until then, passengers must use available road transport for the remaining journey.
6. Important Tips for Train Passengers
- Check your train departure time before leaving for the station.
- Do not assume that the Railway Station metro stop is operational.
- Check the latest operational metro station list on the MPMRCL website.
- Keep additional travel time for the road journey from the metro station.
- Passengers with luggage may prefer a direct auto or cab.
- Verify platform and train information through Indian Railways official services.
7. Official Indore Metro and Railway Links
- MPMRCL Official Website – Metro route, project and passenger service information.
- Government Gazette Notification – Yellow Line notified alignment dated 22 August 2024.
- PIB Press Release – Operational network update dated 5 September 2026.
- Indian Railways Official Website – Railway enquiry and passenger information.
8. Frequently Asked Questions (FAQs)
Can I go directly to Indore Railway Station by metro?
A direct metro passenger service to Indore Railway Station has not been confirmed in the latest operational update used in this article. The railway station is part of the planned Yellow Line alignment.
Which Indore Metro line will connect the railway station?
The Indore Railway Station stop is included in the Yellow Line Ring Corridor.
Where is the planned Indore Railway Station metro stop in the route sequence?
The notified alignment places Railway Station after Palasia Chauraha and before Rajwada.
Is the Indore Railway Station metro section underground?
Yes. The railway station is included among the underground stations listed in the project construction package announcement.
How can I reach Indore Railway Station if the metro station is not open?
Use an operational metro station for part of the journey, if convenient, and complete the remaining distance by auto, cab or another available road transport service. A direct auto or cab is another option.
How many Indore Metro stations are operational?
The PIB announcement dated 5 September 2026 confirmed 16 operational stations covering approximately 17 kilometres.
Will Indore Metro connect the railway station and airport?
Both Railway Station and Airport are included in the notified Yellow Line alignment. Their passenger service availability depends on construction, commissioning and official opening.
Conclusion
Indore Metro Yellow Line includes Indore Railway Station in its planned route, with the station located between Palasia Chauraha and Rajwada in the notified alignment. However, the latest government operational update used here confirms 16 operational stations and does not establish direct passenger service to the railway station. Until the Railway Station metro stop is officially commissioned, passengers should use auto, cab, city bus or another road transport option for the remaining journey. Always check the latest MPMRCL announcement before planning your trip.