Indore Metro Route 2026: Which Areas Does Indore Metro Pass Through?
Indore Metro is being developed as a modern public transportation network to connect major residential, commercial, educational and transport areas of Indore. The Yellow Line is planned as a circular ring corridor connecting Gandhi Nagar, Super Corridor, MR 10, Vijay Nagar, Khajrana, Bengali Square, Palasia, Railway Station, Rajwada and Airport areas.
As of November 2026, 16 stations covering approximately 17 km are operational. The extended operational corridor connects Gandhi Nagar with Malviya Nagar Chauraha. The remaining alignment is planned to extend towards central Indore and the Airport.
Indore Metro Route 2026 – Key Highlights
- Metro Line: Yellow Line
- Route Type: Circular Ring Corridor
- Total notified station locations: 28
- Operational Stations: 16
- Operational Network: Approximately 17 km
- Starting Area: Gandhi Nagar
- Last Operational Area: Malviya Nagar Chauraha / Radisson Square
- Important Areas: Super Corridor, MR 10, ISBT, Hira Nagar and Vijay Nagar
- Future Connectivity: Khajrana, Bengali Square, Palasia, Railway Station, Rajwada and Airport
- Implementing Agency: Madhya Pradesh Metro Rail Corporation Limited (MPMRCL)
1. Indore Metro Route 2026 – Which Areas Does It Cover?
The Indore Metro Yellow Line is designed to connect different parts of the city through a circular corridor. The route begins at Gandhi Nagar and passes through the Super Corridor, Bhawarsala, MR 10, ISBT, Hira Nagar, Bapat Square and Vijay Nagar. The future alignment continues towards Khajrana, Bengali Square, Palasia, Railway Station, Rajwada and Airport.
This route is particularly important because it connects developing areas in northern and eastern Indore with established commercial and central city locations.
2. Gandhi Nagar to Super Corridor Route
The first section of the Indore Metro starts from Gandhi Nagar and moves towards the Super Corridor. This section connects the northern part of Indore with the developing IT and commercial zone along the Super Corridor.
Important stations in this section
- Gandhi Nagar
- Super Corridor 6
- Super Corridor 5
- Super Corridor 4
- Super Corridor 3
- Super Corridor 2
- Super Corridor 1
These stations provide connectivity to Gandhi Nagar, the Super Corridor development zone and nearby residential and commercial areas. The Super Corridor is an important employment and technology development area of Indore.
3. Bhawarsala, MR 10 and ISBT Route
After the Super Corridor, the Yellow Line proceeds towards Bhawarsala and MR 10. This section is important for commuters travelling between the Super Corridor, transport facilities and residential areas of eastern Indore.
Stations in this section
- Bhawarsala Chauraha
- MR 10 Road
- ISBT
The route is planned to improve access to MR 10 and the Inter-State Bus Terminal area. These locations are important for people travelling between different parts of Indore and nearby destinations.
4. Hira Nagar, Bapat Square and Vijay Nagar Route
The next section connects important residential and commercial areas of Indore. Hira Nagar, Bapat Square, Meghdoot Garden and Vijay Nagar are important locations for daily commuters, office employees and students.
Important stations
- Chandragupta Chauraha
- Hira Nagar
- Bapat Chauraha
- Meghdoot Garden
- Vijay Nagar Chauraha
- Malviya Nagar Chauraha
The operational corridor currently reaches Malviya Nagar Chauraha, also associated with Radisson Square. This extension provides metro access to important commercial and residential locations around Vijay Nagar.
5. Khajrana and Bengali Square Metro Route
The future Yellow Line alignment continues from Malviya Nagar Chauraha towards Shaheed Bagicha, Khajrana Chauraha and Bengali Chauraha. These locations are important for connecting the eastern and southern parts of the city with the central metro network.
Planned stations
- Shaheed Bagicha
- Khajrana Chauraha
- Bengali Chauraha
- Patrakar Colony
These stations are part of the notified alignment but are not included in the 16-station operational corridor. Their passenger services will depend on construction, testing and official commissioning.
6. Palasia, Railway Station and Rajwada Metro Route
The central Indore section is planned to connect Palasia, Railway Station and Rajwada. These areas are among the important commercial, administrative and transport locations of the city.
Planned stations
- Palasia Chauraha
- Railway Station
- Rajwada
- Chhota Ganpati
- Bada Ganpati
Once the relevant sections become operational, passengers will have improved access to central markets, railway services and important city destinations. These locations are not part of the currently operational 16-station corridor.
7. Bada Ganpati to Airport Metro Route
The remaining planned alignment continues from Bada Ganpati towards Ramchandra Nagar, BSF Kalani Nagar and Airport. This section is intended to improve connectivity between the city and the airport area.
Planned stations
- Ramchandra Nagar
- BSF Kalani Nagar
- Airport
The Airport station is part of the notified Yellow Line alignment. However, passengers should not consider it operational until MPMRCL officially announces the start of commercial services.
8. Indore Metro Route – Area Wise Station Details
| Area / Location | Related Station | Status |
|---|---|---|
| Gandhi Nagar | Gandhi Nagar | Operational |
| Super Corridor | Super Corridor 6 to 1 | Operational |
| Bhawarsala | Bhawarsala Chauraha | Operational |
| MR 10 | MR 10 Road | Operational |
| ISBT | ISBT | Operational |
| Hira Nagar | Hira Nagar | Operational |
| Bapat Square | Bapat Chauraha | Operational |
| Meghdoot Garden | Meghdoot Garden | Operational |
| Vijay Nagar | Vijay Nagar Chauraha | Operational |
| Malviya Nagar | Malviya Nagar Chauraha | Operational |
| Khajrana | Khajrana Chauraha | Planned |
| Bengali Square | Bengali Chauraha | Planned |
| Palasia | Palasia Chauraha | Planned |
| Central Indore | Railway Station | Planned |
| Rajwada | Rajwada | Planned |
| Bada Ganpati | Bada Ganpati | Planned |
| Ramchandra Nagar | Ramchandra Nagar | Planned |
| Kalani Nagar | BSF Kalani Nagar | Planned |
| Airport | Airport | Planned |
9. Indore Metro Route Map – Complete Yellow Line Sequence
The Government of India Gazette notification dated 22 August 2024 specifies the following Yellow Line alignment:
Officially Notified Yellow Line Alignment
Gandhi Nagar
↓
Super Corridor 6 → Super Corridor 5 → Super Corridor 4 → Super Corridor 3 → Super Corridor 2 → Super Corridor 1
↓
Bhawarsala Chauraha → MR 10 Road → ISBT → Chandragupta Chauraha → Hira Nagar → Bapat Chauraha → Meghdoot Garden → Vijay Nagar Chauraha → Malviya Nagar Chauraha
↓
Shaheed Bagicha → Khajrana Chauraha → Bengali Chauraha → Patrakar Colony → Palasia Chauraha
↓
Railway Station → Rajwada → Chhota Ganpati → Bada Ganpati → Ramchandra Nagar → BSF Kalani Nagar → Airport
The above sequence describes the notified alignment, not a currently available end-to-end passenger service. The first 16 locations are included in the operational corridor as of the September 2026 expansion.
10. How Will Indore Metro Improve City Connectivity?
- Better access to employment and technology development areas.
- Improved public transportation around Vijay Nagar and Super Corridor.
- Convenient connectivity to major residential areas.
- Future access to central markets and commercial locations.
- Planned connectivity with the Railway Station and Airport.
- Potential reduction in traffic congestion and travel time.
- More sustainable public transportation for daily commuters.
11. How to Check Indore Metro Route and Operational Stations?
Passengers can verify the latest route, station status and passenger services through the official MPMRCL website.
- Visit the official Madhya Pradesh Metro Rail Corporation website.
- Open the Indore Metro project section.
- Check the Yellow Line route and station information.
- Identify your starting and destination stations.
- Confirm that both stations are operational.
- Check the latest fare and train service announcements.
PIB: Indore Metro Priority Corridor-2 Inauguration, 5 September 2026
Government of India Gazette: Official Indore Metro Yellow Line Alignment
12. Frequently Asked Questions (FAQs)
Which areas does Indore Metro cover?
The notified Yellow Line connects Gandhi Nagar, Super Corridor, Bhawarsala, MR 10, ISBT, Hira Nagar, Vijay Nagar, Khajrana, Bengali Square, Palasia, Railway Station, Rajwada and Airport areas.
Which areas are currently connected by Indore Metro?
The operational corridor connects Gandhi Nagar, Super Corridor, Bhawarsala, MR 10, ISBT, Hira Nagar, Bapat Square, Meghdoot Garden, Vijay Nagar and Malviya Nagar Chauraha.
Does Indore Metro go to Vijay Nagar?
Yes. Vijay Nagar Chauraha is included in the operational Yellow Line corridor.
Will Indore Metro connect Khajrana?
Khajrana Chauraha is part of the notified future Yellow Line alignment. It is not included in the 16-station operational corridor.
Will Indore Metro connect Palasia?
Yes. Palasia Chauraha is included in the planned Yellow Line alignment.
Will Indore Metro connect Rajwada and Railway Station?
Both locations are included in the notified alignment, but they are not part of the currently operational section.
Will Indore Metro connect the Airport?
Yes. The Airport is the final location in the notified Yellow Line alignment. Passenger services will begin after the relevant section is completed and commissioned.
How many stations are operational in Indore Metro in 2026?
According to the PIB announcement dated 5 September 2026, 16 stations covering approximately 17 km are operational.
Where can I check the Indore Metro route map?
Check the official Madhya Pradesh Metro Rail Corporation Limited website for project and passenger information.
Conclusion
Indore Metro Route 2026 is planned to connect several important areas through the Yellow Line circular corridor. The operational section currently connects Gandhi Nagar, Super Corridor, MR 10, ISBT, Hira Nagar, Bapat Square, Meghdoot Garden, Vijay Nagar and Malviya Nagar Chauraha. The future alignment will extend towards Khajrana, Bengali Square, Palasia, Railway Station, Rajwada and Airport. Passengers should check the official MPMRCL website for current operational stations, construction progress and future service announcements.