Indore Metro Total Stations 2026: How Many Stations Are There?
Indore Metro is one of the major urban transport projects in Madhya Pradesh. The metro network is being developed to connect important residential, commercial, educational and transport areas of Indore. If you are searching for the total number of Indore Metro stations in 2026, it is important to distinguish between operational stations and the complete approved project.
Indore Metro Stations 2026 – Quick Answer
- Operational Stations: 16
- Operational Network Length: Approximately 17 KM
- Approved Ring Line Stations: 30
- Approved Ring Line Length: 31.55 KM
- Metro Line: Yellow Line – Ring Line
- Operational Corridor: Gandhi Nagar to Malviya Nagar Chauraha
- Project Authority: Madhya Pradesh Metro Rail Corporation Limited (MPMRCL)
1. How Many Metro Stations Are Operational in Indore in 2026?
According to the Press Information Bureau announcement dated 5 September 2026, Indore Metro had 16 operational stations covering approximately 17 kilometres after the inauguration of Priority Corridor-2.
The newly inaugurated section was approximately 11 kilometres long and included 11 stations, starting from Super Corridor-3 and extending to Malviya Nagar Chauraha. With this expansion, the operational metro network reached 16 stations.
Therefore, the direct answer is that Indore had 16 operational metro stations as per the September 2026 government announcement. This number refers to stations available on the operational network, not the complete approved project.
2. How Many Total Stations Are Planned in Indore Metro?
The Prime Minister Office published the Union Cabinet approval details for the Indore Metro Rail Project Ring Line. The approved project description mentions a 31.55-kilometre ring line with 30 stations.
This is the approved project figure and should be understood separately from the number of stations currently open to passengers. Construction, commissioning and passenger operations may take place in different phases.
Operational vs Approved Project
Currently Operational
16
Stations announced by PIB in September 2026
Approved Ring Line Project
30
Stations mentioned in the Union Cabinet project approval
3. Indore Metro Operational Station List 2026
The following 16 station names are listed in the operational station directory for the expanded corridor:
| No. | Metro Station | Area / Location |
|---|---|---|
| 1 | Devi Ahilya Bai Holkar Terminal | Gandhi Nagar |
| 2 | Maharani Lakshmi Bai | Super Corridor |
| 3 | Rani Avanti Bai Lodhi | Super Corridor |
| 4 | Rani Durgavati | Super Corridor |
| 5 | Veerangana Jhalkari Bai | Super Corridor |
| 6 | Super Corridor 2 | Super Corridor |
| 7 | Super Corridor 1 | Super Corridor |
| 8 | Bhawarsala Square | Bhawarsala |
| 9 | MR 10 Road | MR 10 |
| 10 | ISBT / MR 10 Flyover | ISBT |
| 11 | Chandragupta Square | Chandragupta Chauraha |
| 12 | Hira Nagar | Hira Nagar |
| 13 | Bapat Square | Bapat Chauraha |
| 14 | Meghdoot Garden | Meghdoot Garden |
| 15 | Vijay Nagar Square | Vijay Nagar |
| 16 | Malviya Nagar / Radisson Square | Malviya Nagar |
Note: Station names in passenger directories may differ slightly from the wording used in government route alignment notifications. Check the latest official MPMRCL passenger information before travelling.
4. Indore Metro Yellow Line Total Route Length
The Union Cabinet approval describes the Indore Metro Ring Line as a 31.55-kilometre project with 30 stations. The operational network, however, was approximately 17 kilometres with 16 stations according to the PIB announcement of September 2026.
These two figures represent different stages of the project:
- Approximately 17 KM: Operational network announced in September 2026.
- 31.55 KM: Approved Ring Line project length.
5. Which Areas Are Connected by Indore Metro?
The Yellow Line Ring Corridor is planned to connect several important parts of Indore, including:
- Gandhi Nagar
- Super Corridor
- Bhawarsala
- MR 10 Road
- ISBT
- Hira Nagar
- Bapat Chauraha
- Meghdoot Garden
- Vijay Nagar
- Malviya Nagar
- Khajrana and Bengali Square areas
- Palasia and Railway Station areas
- Rajwada and Bada Ganpati areas
- BSF Kalani Nagar and Airport areas
These are route areas and alignment locations. Their inclusion in the project does not automatically mean that passenger metro services are currently available at every location.
6. Why Do Different Websites Show Different Total Station Counts?
Readers may find different numbers for the total Indore Metro stations on different websites. This can happen because some sources report currently operational stations, while others describe the approved project or a later station directory.
The official sources used in this article provide two different project figures:
- The PIB announcement dated 5 September 2026 confirms 16 operational stations.
- The Prime Minister Office Cabinet approval describes a 31.55-kilometre Ring Line with 30 stations.
- The Government Gazette notification dated 22 August 2024 lists 28 named locations in its Yellow Line alignment schedule.
The Gazette alignment list and the Cabinet-approved station count are not identical types of information. They should not be treated as interchangeable station directories. For passenger travel, the latest operational station list is the relevant reference.
7. How to Check the Latest Indore Metro Station Status?
- Visit the official MPMRCL website.
- Check the latest route and passenger service announcements.
- Confirm whether your boarding and destination stations are operational.
- Check the latest train timetable and fare information before travelling.
8. Official Sources and Important Links
- MPMRCL Official Website – Metro project and passenger information.
- PIB Press Release – 5 September 2026 – Confirms 16 operational stations and approximately 17 KM network.
- Prime Minister Office – Cabinet Approval – Describes the 31.55 KM Ring Line and 30 stations.
- Government Gazette Notification – Yellow Line alignment notification dated 22 August 2024.
9. Frequently Asked Questions (FAQs)
How many Indore Metro stations are operational in 2026?
According to the PIB announcement dated 5 September 2026, 16 Indore Metro stations were operational across approximately 17 kilometres.
How many total stations are approved for Indore Metro?
The Union Cabinet project approval published by the Prime Minister Office describes a 31.55-kilometre Ring Line with 30 stations.
How many kilometres is the Indore Metro operational network?
The operational network was approximately 17 kilometres according to the September 2026 PIB announcement.
Is the complete Indore Metro Ring Line operational?
No. The 16 operational stations represent the opened network announced in September 2026. The complete approved Ring Line is a larger project.
Which Indore Metro line is currently operational?
The operational corridor is part of the Yellow Line Ring Corridor.
Does Indore Metro connect the Airport and Railway Station?
Airport and Railway Station areas are included in the wider notified route alignment. Their inclusion in the plan should not be taken as confirmation of operational passenger services at those locations.
Where can I check the official Indore Metro station list?
Visit the official MPMRCL website and check its latest passenger service and route information.
Conclusion
The answer to how many Indore Metro stations are available in 2026 depends on whether you mean operational stations or the complete approved project. The September 2026 PIB announcement confirms 16 operational stations across approximately 17 kilometres. The Prime Minister Office Cabinet approval describes the larger 31.55-kilometre Ring Line project with 30 stations. Always check the latest MPMRCL information to confirm which stations are open for passenger services.