Indore Metro Yellow Line Route 2026: All Stations and Complete Route Details
Indore Metro Yellow Line is the main circular metro corridor planned to connect important residential, commercial, transport and public areas of Indore city. The notified route starts from Gandhi Nagar and passes through Super Corridor, Bhawarsala, MR 10, ISBT, Hira Nagar, Vijay Nagar, Khajrana, Bengali Square, Palasia, Railway Station, Rajwada and Airport areas.
The Yellow Line is being developed in phases. According to the Ministry of Housing and Urban Affairs announcement dated 5 September 2026, Indore Metro had 16 operational stations covering approximately 17 kilometres after the inauguration of Priority Corridor-2. The remaining notified route locations are part of the future corridor development.
Indore Metro Yellow Line Route 2026 – Overview
- Metro Project: Indore Metro Rail Project
- Metro Line: Yellow Line
- Route Type: Circular Ring Line
- Notified Route Locations: 28
- Operational Stations: 16
- Operational Network: Approximately 17 KM
- Starting Location: Gandhi Nagar
- Operational Corridor Endpoint: Malviya Nagar Chauraha
- Future Connectivity: Central Indore and Airport
- Project Authority: Madhya Pradesh Metro Rail Corporation Limited
- Official Route Notification: 22 August 2024
1. What is the Indore Metro Yellow Line?
The Indore Metro Yellow Line is a ring corridor designed to connect different parts of the city through an urban rapid transit system. The route is planned to improve connectivity between Gandhi Nagar, Super Corridor, Vijay Nagar, central Indore and Airport areas.
The Government of India issued a Gazette notification on 22 August 2024 under notification number S.O. 3588(E), specifying the Yellow Line alignment for the Indore metropolitan area.
The corridor is being opened in phases. Therefore, passengers should distinguish between operational stations and locations included in the notified future alignment.
2. Indore Metro Yellow Line Complete Station List
The following sequence follows the 28 locations listed in the Government of India Gazette notification. The first 16 locations correspond to the operational corridor announced in September 2026. The remaining 12 locations are part of the notified route beyond Malviya Nagar Chauraha.
| No. | Yellow Line Route Location | Status |
|---|---|---|
| 1 | Gandhi Nagar | Operational corridor |
| 2 | Super Corridor 6 | Operational corridor |
| 3 | Super Corridor 5 | Operational corridor |
| 4 | Super Corridor 4 | Operational corridor |
| 5 | Super Corridor 3 | Operational corridor |
| 6 | Super Corridor 2 | Operational corridor |
| 7 | Super Corridor 1 | Operational corridor |
| 8 | Bhawarsala Chauraha | Operational corridor |
| 9 | MR 10 Road | Operational corridor |
| 10 | ISBT | Operational corridor |
| 11 | Chandragupta Chauraha | Operational corridor |
| 12 | Hira Nagar | Operational corridor |
| 13 | Bapat Chauraha | Operational corridor |
| 14 | Meghdoot Garden | Operational corridor |
| 15 | Vijay Nagar Chauraha | Operational corridor |
| 16 | Malviya Nagar Chauraha | Operational corridor |
| 17 | Shaheed Bagicha | Future alignment |
| 18 | Khajrana Chauraha | Future alignment |
| 19 | Bengali Chauraha | Future alignment |
| 20 | Patrakar Colony | Future alignment |
| 21 | Palasia Chauraha | Future alignment |
| 22 | Railway Station | Future alignment |
| 23 | Rajwada | Future alignment |
| 24 | Chhota Ganpati | Future alignment |
| 25 | Bada Ganpati | Future alignment |
| 26 | Ramchandra Nagar | Future alignment |
| 27 | BSF Kalani Nagar | Future alignment |
| 28 | Airport | Future alignment |
Important: The table reproduces the 28 locations in the Gazette route sequence. It is not a confirmation that every listed location is currently open for passenger services. The exact station names used in passenger signage may differ from the alignment wording.
3. Indore Metro Yellow Line Operational Stations
The operational corridor was expanded after the inauguration of Priority Corridor-2 on 5 September 2026. The PIB announcement states that the new approximately 11 km section runs from Super Corridor-3 to Malviya Nagar Chauraha and comprises 11 stations. With the expansion, the total operational network reached approximately 17 km and 16 stations.
The operational station directory includes the following station names:
- Devi Ahilya Bai Holkar Terminal (Gandhi Nagar)
- Maharani Lakshmi Bai
- Rani Avanti Bai Lodhi
- Rani Durgavati
- Veerangana Jhalkari Bai
- Super Corridor 2
- Super Corridor 1
- Bhawarsala Square
- MR 10 Road
- ISBT / MR 10 Flyover
- Chandragupta Square
- Hira Nagar
- Bapat Square
- Meghdoot Garden
- Vijay Nagar Square
- Malviya Nagar Chauraha / Radisson Square
For actual train availability, passengers should check the latest service information on the official metro platform before travelling.
4. Indore Metro Yellow Line Route – Area Wise Details
Gandhi Nagar and Super Corridor
The route begins at Gandhi Nagar and passes through the Super Corridor stations. This section is important for connectivity towards the northern part of Indore and the Super Corridor development area.
Bhawarsala and MR 10
After Super Corridor, the route reaches Bhawarsala Chauraha and MR 10 Road. These locations provide connectivity towards important road corridors and developing residential areas.
ISBT and Hira Nagar
The next portion includes ISBT, Chandragupta Chauraha, Hira Nagar and Bapat Chauraha. This part of the route is relevant for passengers travelling towards bus transport facilities and nearby residential and commercial areas.
Meghdoot Garden and Vijay Nagar
The corridor continues through Meghdoot Garden, Vijay Nagar Chauraha and Malviya Nagar Chauraha. These are important commercial and employment areas of Indore.
Khajrana, Bengali Square and Palasia
The notified future alignment continues towards Shaheed Bagicha, Khajrana Chauraha, Bengali Chauraha, Patrakar Colony and Palasia Chauraha. These locations are part of the planned extension beyond the currently operational corridor.
Railway Station, Rajwada and Airport
The remaining notified alignment includes Railway Station, Rajwada, Chhota Ganpati, Bada Ganpati, Ramchandra Nagar, BSF Kalani Nagar and Airport. This section is intended to extend metro connectivity towards central Indore and the airport side.
5. Indore Metro Yellow Line Route Map
The Yellow Line is a circular ring corridor. The following route sequence is based on the official Gazette notification:
Yellow Line Route Sequence
Gandhi Nagar
↓
Super Corridor 6 → Super Corridor 5 → Super Corridor 4 → Super Corridor 3 → Super Corridor 2 → Super Corridor 1
↓
Bhawarsala Chauraha → MR 10 Road → ISBT → Chandragupta Chauraha → Hira Nagar → Bapat Chauraha → Meghdoot Garden → Vijay Nagar Chauraha → Malviya Nagar Chauraha
↓
Shaheed Bagicha → Khajrana Chauraha → Bengali Chauraha → Patrakar Colony → Palasia Chauraha
↓
Railway Station → Rajwada → Chhota Ganpati → Bada Ganpati → Ramchandra Nagar → BSF Kalani Nagar → Airport
For the official notified alignment, download the Government of India Gazette PDF. For passenger services and current station availability, use the official MPMRCL website.
6. Indore Metro Yellow Line Route Length and Project Details
The PIB announcement dated 5 September 2026 confirms that the operational Indore Metro network covered approximately 17 kilometres and 16 stations. The newly inaugurated Priority Corridor-2 section was approximately 11 kilometres long and had 11 stations, connecting Super Corridor-3 with Malviya Nagar Chauraha.
The operational network figure should not be confused with the complete future ring corridor. The entire notified alignment includes additional locations beyond the currently operational section.
7. Which Important Areas Will the Yellow Line Connect?
- Gandhi Nagar and Super Corridor
- Bhawarsala and MR 10 Road
- ISBT and Hira Nagar
- Bapat Chauraha and Meghdoot Garden
- Vijay Nagar and Malviya Nagar
- Khajrana and Bengali Chauraha
- Patrakar Colony and Palasia
- Railway Station and Rajwada
- Bada Ganpati and Ramchandra Nagar
- BSF Kalani Nagar and Airport
8. How to Check Indore Metro Yellow Line Train Services?
- Visit the official MPMRCL website.
- Look for passenger services, route or journey planning information.
- Select the available starting and destination stations.
- Check current service availability and travel information.
- Confirm the latest station status before leaving for the metro station.
Timings, fares, frequency and service conditions can change. Always check the latest official passenger information rather than relying on an old timetable.
9. Official Indore Metro Links
- MPMRCL Official Website – Project and passenger information.
- Government Gazette Notification PDF – Official Yellow Line route alignment dated 22 August 2024.
- PIB Press Release – Priority Corridor-2 inauguration and 16 operational stations, dated 5 September 2026.
10. Frequently Asked Questions
How many stations are included in the Indore Metro Yellow Line Gazette alignment?
The Government of India Gazette notification dated 22 August 2024 lists 28 route locations for the Yellow Line alignment.
How many Indore Metro Yellow Line stations are operational?
According to the PIB announcement dated 5 September 2026, 16 stations covering approximately 17 kilometres were operational.
Where does the Indore Metro Yellow Line start?
The notified Yellow Line alignment starts from Gandhi Nagar and continues through Super Corridor towards the rest of the ring corridor.
Which is the last operational area on the Yellow Line?
The operational corridor announced in September 2026 extends up to Malviya Nagar Chauraha, also referred to as Radisson Square in passenger station listings.
Does the Yellow Line connect Indore Airport?
Airport is included in the notified future Yellow Line alignment. It should not be treated as an operational metro station until passenger services are officially commissioned there.
Does the Yellow Line connect Indore Railway Station?
Railway Station is included in the notified alignment after Palasia Chauraha. Check official announcements for its construction and commissioning status.
Where can I download the Indore Metro Yellow Line route PDF?
The official route alignment notification can be downloaded from the Government of India eGazette PDF link provided in this article.
Is the complete Yellow Line operational?
No. The 16-station operational network is only a part of the complete notified alignment. The remaining route locations are planned for future development.
Conclusion
Indore Metro Yellow Line is planned as a circular corridor connecting Gandhi Nagar, Super Corridor, Vijay Nagar, Khajrana, Palasia, central Indore and Airport areas. The Government of India Gazette notification lists 28 route locations, while the September 2026 PIB announcement confirms 16 operational stations across approximately 17 kilometres. Passengers should check the latest MPMRCL announcements for current train services, upcoming stations and route extensions.